02 10.07
MACKAY
Well it actually rained all day albeit very lightly.
Bert and I cut the drain hose from the sink to find that it was full of silicone from day one( no wonder the BLOODY THING WOULDN’T WORK!!!!!, over two months of trying to get it to dribble out, reminded me of me).)
After lunch Bert took us for a drive to Hay Point and Sarina. Hay Point is a huge coal loading facility that receives 30 trains a day most up to 2 kilometers long. There were 48 ships waiting to be loaded and as it was a rainy day there may have been more on the horizon we weren’t able to see.
On the Wyt home we went through the city and down to the harbour area which has avery long breakwater protecting a new marina , great fishing spot.
That evening we went to a local club with a group of their friends for a meal.
No comments:
Post a Comment